Conveyor

CI/CD

The problem

A home equity operation goes through many hands (partner, analysis, legal, payment) and every stage requires documents and checks. Without a single place, operations stalled and nobody knew which stage they were in or what was missing to move on.

On every PR: the changelog runs on an empty database and is rolled back, each service runs its tests at 100% coverage in parallel and the front-ends pass lint, typecheck and build. Deploy is manual: images to ECR, migration first, then the rollout.

Decisions and why

One matrix job per service
Seven services test in parallel and one does not hide another's failure (fail-fast off).
Migration before rollout
New code only gets traffic once the schema is ready.
Deploy on a button
Releasing is a decision, not a side effect of a merge.
requestresponse
Pick a scenario above to watch the message travel through the architecture.

What it looks like

Replica of the pipeline board with fictional data (internal system)
esteira.evilrabbit.com.br/lines/triage
EsteiraPTGM
Triagem
Conferência de dados2
Marina SouzaGMR$ 480 mil 1 d
Paulo HenriqueR$ 1,2 mi hoje
Combate à fraude1
Ricardo AlvesAPR$ 750 mil 4 d
Validação dos documentos2
Carla PradoGMR$ 610 mil 2 6 d
João ReisR$ 295 mil 2 d
Aguardando aprovação0
Nada aqui